Wall screws: Space every 16" vertically (one screw per stud), per IBC 2018 Section 805.3 and GA-216. With 1/2" gypsum wallboard on wood studs 16" o.c., one screw per stud is code-compliant.
Ceiling screws: Space every 12" vertically (staggered pattern), per IBC Section 805.3 and GA-216 Table 3.1. Ceilings require closer spacing due to gravity loads and potential sagging.
Key details:
- Use #6 x 1-5/8" screws for 1/2" board (penetrate stud ≥ 5/8").
- Stagger end joints 6" minimum.
- No adhesive allowed per your plan—spacing compensates.
Safety note: If ceiling spans exceed 12" o.c. or you're in a seismic/high-wind zone, consult a structural engineer. Otherwise, this spacing meets standard residential codes.