The inspector is likely requiring an outside disconnect (sometimes called a "meter-combo" or "service disconnect switch") per NEC 230.70(A)(3) and 230.70(A)(4) — when the service entrance conductors are more than 6 feet long inside the building, or when the panel isn't readily accessible from outside.
Since your main panel is in the garage and the meter is on the exterior wall, the inspector wants a way for firefighters (or utility workers) to shut off power without entering the house.
Options:
- Meter-Socket Combo with Built-in Disconnect Replace the existing meter socket with a meter-combo unit that includes a 200A disconnect switch. This satisfies the requirement and keeps everything in one outdoor enclosure.
- Outdoor Disconnect Switch Near Meter Install a 200A fusible or non-fusible disconnect in a weatherproof box near the meter, ahead of the panel. Must be within sight of the meter and accessible.
- Relocate Main Panel Outside If feasible, move the main panel to an exterior wall so it serves as its own disconnect.
Key Code References:
- NEC 230.70(A)(3): Requires the service disconnect to be within sight of the service entrance conductors.
- NEC 230.70(A)(4): If the disconnect is at a different location than the meter, it must still be readily accessible and grouped with the meter base.
- NEC 230.85: If the disconnect is outside, it must have a clear view of the service entrance point.
Recommendation:
Install a meter-combo disconnect — cleanest solution, meets code, and satisfies the inspector. Make sure it's rated for outdoor use and properly secured.
Let me know if you're on a utility-restricted meter program — some require utility-side disconnect approval.