Major Code & Hydraulic Violations:
- Backflow Protection (IPC 608.16 / UPC 603.4.6): A hose bibb connection (atmospheric vacuum breaker/AVB) is illegal for a pressurized mainline. AVBs cannot be under continuous pressure (12+ hrs/day). You need a Pressure Vacuum Breaker (PVB) installed 12" above highest head, or a Reduced Pressure Principle Assembly (RP) if chemigation is possible. Hose bibb AVBs are for temporary hose-end use only.
- Watering Time (Local Ordinance/State Law): 1 p.m. runtime violates near-universal daytime watering bans (typically 10 a.m.–6 p.m.) due to evaporation/wind loss. Controller must run pre-dawn (e.g., 4 a.m.).
- No Rain/Freeze Sensor (IPC 607.2 / IECC / Most State Statutes): Mandatory on new installs. Wiring a sensor is non-negotiable.
- Zone 4 Hydraulics (Exceeds 3/4" Meter Capacity): 4 Rotors (~3–4 GPM each) + 6 Sprays (~1.5–2 GPM each) = ~21–28 GPM demand. A 3/4" meter safe continuous capacity is ~10–12 GPM (AWWA M22). You cannot run this zone. Split into 2–3 zones or upsize meter/service (requires utility approval).
- Mainline Velocity/Pressure Loss: 1" PVC at 20+ GPM = >8 ft/sec velocity (limit 5 ft/sec) and massive friction loss. Upsize mainline to 1.25" or 1.5".
- Mixed Precipitation Rates: Rotors (~0.4 in/hr) and Sprays (~1.5 in/hr) cannot share a zone. Sprays will flood/rotors starve. Separate by head type.
Required Fixes: Install PVB/RP backflow; move schedule to pre-dawn; add rain/freeze sensor; split Zone 4 by head type & hydraulic capacity; upsize mainline.