Short answer: 12 inches minimum below undisturbed grade. There is no frost line requirement in Florida.
Code Basis (FBC 2023 / IRC 2021):
- R403.1.4.1 (Frost Protection): Explicitly states footings do not need to extend below frost line in Climate Zones 1–2 (All of Florida is Zone 1A or 2A).
- R403.1.4 (Minimum Depth): Footings shall extend 12 inches minimum below undisturbed ground surface.
- R403.1.1 (Width): Minimum 12 inches wide for 1-2 story (check Table R403.1 for soil bearing capacity).
What actually drives depth in Florida:
- Organic/Unsuitable Soil: You must dig through muck, peat, or loose fill until you hit competent bearing soil (often 18”–36”+ down). Code requires bearing on undisturbed native soil or engineered fill (R403.1).
- High Water Table: Footings often sit in water. You may need dewatering, flowable fill, or a mat slab. Don't pour concrete into standing water without a tremie or pump.
- Scour/Erosion (Coastal/Zone V/A): If in a flood zone, FBC Chapter 16 / ASCE 24 requires deep foundations (piles/piers) penetrating to refusal or specified depth—often 10–20 ft below grade. Shallow footings are prohibited.
- Termite Treatment: Slab edge/footing trench must be treated per FBC R318 / Florida Statute 482.
Tell the Ohio guy: "We don't dig for frost; we dig for bearing." Verify soil with a probe or geotech report before pouring. If you hit organics or water, stop and call the engineer.