Three code violations (ACI 318/IRC R403):
- Mesh on poly = zero cover. 6×6 W2.9/W2.9 on vapor barrier puts steel at slab bottom. ACI 318-19 §20.5.1.3 requires ¾" clear cover for slabs on ground. Wire must be supported on chairs/blocks before pour. "Hooking with a rake" is prohibited (ACI 301 §5.3.3); it bends wires, creates voids, and yields random depth—usually still on poly.
- Corner rebar on dirt = zero cover & continuity failure. Thickened-edge footing corners require continuous reinforcement (IRC R403.1.3.5). Bars on grade violate 3" cover (ACI 318 §20.6.1.3) against earth. They also cannot develop lap splices or corner tension if not suspended.
- No support system. Both mat and footing steel need chairs, dobies, or plastic spacers placed before concrete. Raking is not a placement method.
Fix now:
- Stop pour. Lift mesh onto ¾"-high chairs (2'–3' grid).
- Prop corner bars on 3"-high dobies/blocks; ensure laps per Table R403.1.3.5.
- Verify all steel position before mud hits forms.