Containment Requirements (40 CFR 745.85):
Exterior Containment Must:
- Ground cover: Extend 10 ft beyond paint disturbance in all directions (or to property line). Use impermeable poly (6-mil min) or equivalent. Weight edges.
- Vertical containment: Required if within 10 ft of property line, sidewalk, or occupied area. Use 6-mil poly on scaffolding/fencing, sealed to ground cover.
- Doors/windows: Within work area → close and seal with poly. Within 20 ft horizontally → close.
- Entry: Use airlock/flap system if vertical containment used.
- Signage: "Warning: Lead Work Area" at all entrances (per 745.85(c)).
Flat-Out Prohibited (745.85(a)(3), 745.86):
- Open-flame burning/torching paint
- Heat guns >1100°F (infrared paint strippers typically OK if <1100°F)
- Power sanding/grinding/planing without HEPA shroud + HEPA vacuum attached
- Uncontained hydroblasting/pressure washing (must capture all wastewater/debris)
- Dry sweeping or compressed air cleaning
- Exterior work in high winds (≥20 mph) without adequate containment
- Leaving debris on ground cover overnight without securing
Critical: All waste = lead waste (bag/gooseneck/HEPA vac). Clean until no visible dust/debris. Clearance verification by certified renovator required before teardown (visual + verification wipe if required by state/local).
Check state/local rules — many (e.g., CA, NY, MA) exceed federal minimums.