Statewide (FBC 2023, Ch. 15 & 1612):
- Florida Product Approval (FPA) or Miami-Dade NOA for the shingles (Category: Roofing, Sub: Asphalt Shingles).
- FPA/NOA for Underlayment (synthetic or felt) and Starter/ Hip-Ridge accessories.
- Roof Deck Attachment Verification: Signed affidavit or photos proving existing deck meets FBC 1507.2.1 (8d @ 6"/12" or re-nailing per Table 1507.2.1.1(1)).
- Secondary Water Barrier (SWB) Affidavit: Required per FBC 1507.2.9 (self-adhered tape or peel-and-stick over joints) unless deck is concrete.
- Wind Speed/Exposure Calcs: Site-specific design pressure (ASCE 7-22) matching shingle FPA pressure rating.
- Contractor’s License & Insurance (Workers’ Comp exemption or cert).
Miami-Dade County (Chapter 16, Implementing Order 8-24):
- NOA Mandatory: Only Miami-Dade Notices of Acceptance (NOAs) are accepted for shingles, underlayment, fasteners, adhesives, and flashings. State FPA numbers are rejected.
- High-Velocity Hurricane Zone (HVHZ) Protocols: Installation must follow the specific NOA’s “Installation Instructions” (often stricter nailing patterns, 6 nails/shingle, specific starter courses).
- Deck Re-nailing: Mandatory inspection before underlayment; 8d ring-shank @ 4" o.c. edges / 6" field (per specific NOA or MDC TAS 117).
- SWB: Self-adhered membrane over entire deck often required per specific shingle NOA, not just joints.
- Permit Submittal: Requires signed/sealed Roofing Permit Application (Form ROOF-1), Product Control Submittal Sheet listing every NOA number, and a Letter of Compliance from the roofer.
Key Difference: Statewide = FPA or NOA. Miami-Dade = NOA only, whole-system listing, stricter nailing/SWB, pre-dry-in inspection mandatory.