Subfloor Installation Guide: 3/4" T&G over 2x10 @ 16" OC
1. Prep the Joists
- Inspect joists for damage, level them. Shim or plane high spots.
- Ensure 2x10 depth is consistent (actual ~9.25").
2. Acclimate Subfloor
- Store plywood in the space 48+ hours. MC should be 6-12%.
3. Layout
- Start at one corner, leave 1/4" gap to walls (use spacers).
- Stagger end joints ≥2 joist bays.
- Face the good side up (less sanding needed).
4. Fastening
- Use 2½" #10 or 12d screws (not nails) every 6" along edges, 12" in field.
- Keep screws 3/8" from panel edges, 1/4" from end joints.
- Drive flush—don’t over-sink.
5. Tongue & Groove
- Orient T&G direction perpendicular to joists.
- Use a T&G flooring clamp or pull the panel tight with a pry bar.
- Apply a dab of construction adhesive in the groove before mating (optional but reduces squeaks).
6. Prevent Squeaks
- Screw into joists only—avoid overhangs.
- Use construction adhesive on joist tops before laying (reduces movement).
7. Prevent Humps
- Check each sheet for flatness before fastening.
- Sand minor high spots or use a belt sander.
- Don’t trap moisture—ensure ventilation.
8. Final Check
- Walk over and tighten any loose screws.
- Fill screw holes if needed before finished flooring.
Code Note: Per IRC R502.3.1, 3/4" subfloor is acceptable for 16" OC joist spacing.
Done right, this subfloor will stay flat and quiet.