Trade
Carpentry & Framing
40 exam tasks · 0 graded
Best score
—
Grading in progress
Models
5
in this exam run
Tasks
40
20 / 8 / 12 K / C / C
Live questions
0
asked in the arena
Carpentry & Framing leaderboard
Journeyman Score on this trade's tasks only · Higher is better
| # | ||||||||
|---|---|---|---|---|---|---|---|---|
Dots3-Note PreviewDots Studiofree | —
| — | — | — | — | 0/40 | — | |
Gemma 4 31BGooglefree | —
| — | — | — | — | 0/40 | — | |
Laguna S 2.1Poolsidefree | —
| — | — | — | — | 0/40 | — | |
Nemotron 3 Super 120BNVIDIAfree | —
| — | — | — | — | 0/40 | — | |
Nemotron 3 Ultra 550BNVIDIAfree | —
| — | — | — | — | 0/40 | — |
Exam questions
Public bank tasks, grouped by family · the full v1.0 bank is public
Knowledge 20
Practical how-to a journeyman knows cold.
- Task CA-001
I'm setting floor joists and some of them have a visible bow along the edge. Which way do I put them in, and does it actually matter?
Knowledge - Task CA-002
Gable roof, 6/12 pitch, building is 24 feet wide outside to outside, ridge is a 2x (1-1/2 in. thick). How long is my common rafter from the birdsmouth heel to the plumb cut at the ridge, and how do I get there with a framing square?
Knowledge - Task CA-003
Laying out a wall plate for studs at 16 on center. Where do I put my first mark so the 4x8 sheathing breaks on a stud?
Knowledge - Task CA-004
Homeowner wants a 6-foot slider in an exterior bearing wall of a one-story ranch with trusses. What do I need to know to size the header without calling an engineer, and how do I support it?
Knowledge - Task CA-005
What's the right way to nail off a face-mount joist hanger like a Simpson LUS210? I've got a guy who fills the ones he feels like and skips the rest.
Knowledge - Task CA-006
How do I toe-nail a stud to a plate so it actually holds and doesn't split or kick out of position?
Knowledge - Task CA-007
I'm laying out batter boards and strings for a 24 by 40 addition foundation. How do I make sure it's square before we dig?
Knowledge - Task CA-008
The plumber needs to run a 2-inch drain through a row of 2x10 floor joists. What are the rules on where and how big I can let him drill?
Knowledge - Task CA-009
Laying 3/4 T&G subfloor over 2x10s at 16 on center. Walk me through doing it so it doesn't squeak or hump later.
Knowledge - Task CA-010
What's the standard nail schedule for 7/16 OSB wall sheathing, and when do I need to block the horizontal panel edges?
Knowledge - Task CA-011
Total rise from finished floor to finished floor is 108 inches, straight run, 2x12 stringers, 1-inch treads. Lay out the stringer for me: how many risers, what rise, what run, and what do I have to watch at the bottom and the throat?
Knowledge - Task CA-012
How deep can I cut the birdsmouth on a 2x8 rafter sitting on a 2x4 wall, and how do I lay out the seat and heel?
Knowledge - Task CA-013
I'm building up a three-ply 2x12 girder from 16-foot stock for a 32-foot floor beam over posts. How do I nail it and where do the joints go?
Knowledge - Task CA-014
What order do I flash a flanged window in a house-wrapped wall so water can't get behind it?
Knowledge - Task CA-015
First time framing a floor with TJI I-joists instead of sawn lumber. What do I have to do differently?
Knowledge - Task CA-016
Cutting hip rafters for a 6/12 hip roof with the commons already up. How do I get the hip length and cuts, and what's this about dropping the hip?
Knowledge - Task CA-017
Inspector told me my collar ties don't count as rafter ties. I thought they were the same thing. What's the difference and where does each one go?
Knowledge - Task CA-018
The grade stamp on the 2x10s says SPF, No.2, S-DRY, with a mill number and an agency logo. What does each of those tell me and why would the inspector care?
Knowledge - Task CA-019
Building a ground-level deck with 4x4 posts in the dirt and joists a few inches off grade. What treated lumber and hardware do I spec so it doesn't rot or corrode?
Knowledge - Task CA-020
Plans call for a 3-foot cantilever off the second floor for a bump-out that carries the exterior wall and roof above. Floor joists are 2x10 at 16. What are the rules for that cantilever?
Knowledge
Code 8
Code and spec lookups with the jurisdiction stated.
- Task CA-021
Plumber wants to bore a 3-inch hole through the 2x6 studs of an exterior bearing wall for a shower drain. What does the code let him do?
Code - Task CA-022
The HVAC guy cut a 3-inch-wide notch across the double top plate of a 2x4 bearing wall for a duct. The framing inspector flagged it. What's the fix he's expecting?
Code - Task CA-023
Setting a treated sill plate on a new stem wall. What size anchor bolts, how far apart, and how deep do they have to be?
Code - Task CA-024
New 30 by 50 house with a vented attic, soffit vents and a ridge vent. How much net free vent area does the code want, and can I use the smaller 1/300 number?
Code - Task CA-025
I frame in Ohio and just took a job in Jacksonville. My roofer says I can't do rafter tie-downs the way I'm used to, using the IRC Table R802.11 uplift numbers. What's different in Florida?
Code - Task CA-026
Building a house in a wind-borne debris region on the Florida coast. The owner doesn't want to pay for impact windows and asks if plywood shutters are legal. What does the code say?
Code - Task CA-027
Basement stairs in a new house: what are the code limits on riser height, tread depth, headroom, and how consistent the steps have to be?
Code - Task CA-028
Framing inspector wants me to re-do some of my double top plates. What are the rules on where the splices go and the corners?
Code
Catch 12
Bad premise or hidden hazard. A good answer catches it.
- Task CA-029
Crew is hanging a 12 by 16 deck off a two-story brick house. They set the 2x10 ledger tight against the brick, ran 3/8 by 4-inch lags every 24 inches through the brick into whatever's behind, no flashing, and are ready to hang joists. What's wrong?
Catch - Task CA-030
Remodel on a 1960s ranch, 2x6 rafters at 24 with a 2x8 ridge board, 24-foot span, 6/12. Owner wants a vaulted living room, so the crew pulled the ceiling joists out of that 16-foot section and is drywalling the rafters. Walls look fine so far. What's coming?
Catch - Task CA-031
HVAC contractor needs to get an air handler into the attic of a truss-framed house. His guys cut out the bottom chord and one web of two adjacent trusses to widen the hatch to 30 by 48, and the framer says he'll sister 2x6s alongside the cut chords and call it good. Inspection is tomorrow. What do you tell them?
Catch - Task CA-032
Walking a deck rough-in: 2x10 joists in LUS28 hangers, the hangers are nailed with 1-1/2 inch galvanized roofing nails in the face holes and the diagonal joist holes are empty, and the joists are sitting about 3/4 inch above the hanger seat because the hanger was nailed up first. Owner says it feels solid. Is it?
Catch - Task CA-033
The plumber ran a 3-inch drain along the bottom of a 2x10 floor joist and cut a 3-inch-deep notch across the bottom edge right in the middle of a 14-foot span, then screwed a steel strap across the notch. He says the strap makes it stronger than before. Does it?
Catch - Task CA-034
New crew sheathed a 40-foot wall with 7/16 OSB. They started layout from the corner with the first stud at 16 (not 15-1/4), butted every panel tight with no gap, and the gun was set so the nail heads are buried about 1/8 inch into the face. It looks clean. What are you going to make them fix?
Catch - Task CA-035
Framer put a double 2x10 header over a 6-foot patio door in a bearing wall, but instead of jack studs he end-nailed the header through the king studs with four 16d each side and ran cripples up to the top plate. He says the nails and the cripples carry it. Does that pass?
Catch - Task CA-036
Truss roof on a new house in Clay County, Florida, 130 mph wind zone. The framer nailed the 7/16 OSB roof deck with 8d smooth-shank gun nails at 6 on the edges and 12 in the field, used H2.5 clips on every other truss with three nails each because that's how he did it up north, and wants to call for the dry-in inspection. What's going to happen?
Catch - Task CA-037
The concrete crew wet-set J-bolts in the stem wall at 8 feet on center and the closest bolt to each corner is about 30 inches from the end of where the sill plate will stop. Framer says he'll just add a few Tapcons where he needs them. Good enough?
Catch - Task CA-038
Finishing a deck that sits 4 feet above grade. The rail is 34 inches tall, 2x2 pickets are spaced 5 inches clear, and there's an 8-inch gap between the deck boards and the bottom rail. What's the inspector going to flag?
Catch - Task CA-039
Deck guard posts: the crew notched 4x4 posts halfway through to sit flush on the outside of the rim, ran two 1/2-inch carriage bolts through the notched part into the 2x10 rim, no blocking behind the rim, and then hung the guard rails. Bolts are tight and the posts feel okay. Why is the inspector or anyone with experience going to make them redo it?
Catch - Task CA-040
Apprentice cut all 26 common rafters for an 8/12 gable off a pattern he laid out with the line length measured to the center of the ridge, using a 2x ridge. He also set the birdsmouth so the seat cut runs out 1/2 inch past the outside face of the 2x4 plate. First pair went up and the ridge won't sit right. What did he do and what does it mean for the rest of the stack?
Catch