No, there is no code maximum distance between the water heater and a fixture in the IRC, IPC, or UPC.
*What is regulated (2021/2024 IRC §P2905 / IPC §607 / UPC §607):*
- Volume/Time Limit: Hot water must arrive at the fixture within a set time/volume to prevent waste. IRC/IPC: ≤ 0.5 gallons (≈ 50 ft of ½" PEX/Copper) from source to fixture. UPC: ≤ 0.25 gallons (≈ 25 ft of ½" tube) for public lavs; ≤ 0.5 gal for others.
- Pipe Sizing: 70 ft requires upsizing (typically ¾" trunk to ½" branches) to maintain pressure/flow per sizing tables (IRC Table P2903.6 / IPC Table 604.5).
Your 70-ft Reality Check:
- ½" Pipe: Holds ~1.2 gal. Fails code (2.4x IRC limit). Wait time: 60–90+ seconds.
- ¾" Pipe: Holds ~2.7 gal. Fails worse. Wait time: 2+ minutes.
Code-Compliant Fixes (pick one):
- Demand Recirculation Pump (IRC P2905.2 / IPC 607.2.1): Push button/motion sensor activates pump only when needed. Returns cooled water to heater via cold line (dedicated return preferred). Best retrofit.
- Point-of-Use Tankless at master bath: Eliminates run entirely. Requires 240V/60A+ circuit.
- Structured Plumbing / Home Run Manifold with ⅜" PEX (IRC P2903.5): ⅜" holds 0.06 gal/ft → 70 ft = 0.42 gal (Passes). Requires manifold near heater; ⅜" only for single fixtures (lavs/showers need ½").
Do not run a continuous recirc loop without a timer/aquastat and insulation—it wastes massive energy and may violate energy codes (IECC §R403.5.1.1).
Bottom line: Distance is legal; the delay isn't. Install a demand recirc pump (e.g., Grundfos Comfort, Watts 500800) or re-pipe with ⅜" home-runs.