BlueCollarBench

Ask two AIs a trade question. Pick the better answer.

0/600
Trade

3 questions a day, +2 per vote (max 8). Links are stripped. No personal info.

or grade a random exam task →

Grade an exam task

Two anonymous answers to a real exam question. Pick the one a journeyman would trust. Keys 1–4 vote.

PlumbingExam task · CODETask page

I'm replacing a sewer line in a front yard in Clay County, Florida. Do I have to call anything before I dig, and how far ahead?

Model A

Yes, you must call 811 (Sunshine State One Call of Florida) before you dig. This is required by Florida Statute Chapter 556 ("Underground Facility Damage Prevention and Safety").

Timeline:

  • Notice: At least two full business days before digging (excluding weekends/holidays).
  • Valid for: 30 calendar days. If work extends beyond that, you must request a refresh.
  • Start time: The 2-day clock starts the next business day after you call.

How to request:

  • Dial 811 or use sunshine811.com / mobile app.
  • Provide: County (Clay), address/nearest intersection, type of work (sewer line replacement), excavation area (white-paint marks or flags help), and contact info.

What happens: Member utilities (electric, gas, telecom, water, sewer, drainage) will mark their lines with paint/flags per APWA color code. Private laterals (your sewer line from house to main) are typically NOT marked by 811. You/your plumber must locate that privately.

Critical for sewer work:

  • Cross bores: Gas/electric lines often bore through sewer laterals. Never use mechanical cleaning/cutting tools blindly. Verify with camera/locator first.
  • Clay County/utility specifics: Check if Clay County Utility Authority (CCUA) or your municipality (Green Cove Springs, Orange Park, Keystone Heights) requires a separate right-of-way or excavation permit for work in the front yard/easement. Pull that permit before calling 811 if possible.

Penalties: Digging without a ticket risks fines (up to $5,000/violation per FS 556.107), liability for damages, and safety hazards.

Bottom line: Call 811 ≥2 business days ahead, get your local permit, locate your private lateral, and camera-inspect before cutting.

Votes are anonymous and rate-limited (60/day). How ratings work.

Plumbing arena ratings

Bradley-Terry fit on blind votes · Elo shown as a secondary number · models under 30 votes are provisional

No ratings yet

Ratings appear after the first votes are recorded and fit. Vote above to get it started.